Skip to main content

Civil Repairs, Waterproofing & Deck Reinstatement - Dry Deck Fountain

Back

In order to participate in tenders and get the latest tender notifications online, you need to be a registered member

Sign in to your account

Sign in with UAE PASS to apply for this tender

Tender Details

Active Category: Civil Repairs Type: Electrical
Department
مرسي عجمان
Tender Number
SEMI-4128
Tender Title
Civil Repairs, Waterproofing & Deck Reinstatement - Dry Deck Fountain
Two Stage
No
Open Date
11/09/2026 15:41
Close Date
25/09/2026 00:00
Buyer Name
أماني شلبي
Contact
Butros Memari

Description

• Establish barriers and protect adjacent finishes, public routes and existing services. • Carefully remove the approved sections of paving, deck supports and defective finishes. Record and safely store reusable materials. • Repair the fountain basin, substrate, defective drain… Read more ▾ Show less ▴

• Establish barriers and protect adjacent finishes, public routes and existing services. • Carefully remove the approved sections of paving, deck supports and defective finishes. Record and safely store reusable materials. • Repair the fountain basin, substrate, defective drainage channels/outlets and deck support system in accordance with the approved repair design. • Supply and install the approved waterproofing system, including surface preparation, joints, corners and sealing around service penetrations. • Carry out the approved waterproofing test, rectify defects and obtain inspection acceptance before covering the work. • Reinstate approved deck supports and paving after acceptance of concealed services, ensuring stable surfaces, suitable drainage falls, slip-resistant finishes and maintenance access. • Remove debris and submit completion photographs, waterproofing warranties. • Inspect and repair the supports carrying the granite slabs, including frames, pedestals, brackets, fixings and connections. Replaced damaged or corroded components where necessary, in accordance with the approved repair design, to ensure adequate load capacity and prevent slab movement or rocking. • Carry out a witnessed water-flow test to demonstrate that water drains from the treated surrounding floor through the designated collection system and returns to the fountain tanks without unacceptable ponding or

Note To Suppliers

Detailed specific scope of work shall be shared with interested contractors.

Line Items

Line Line Type Description Category Unit Quantity Need By From Need By To
1 Services Civil Repairs, Waterproofing & Deck Reinstatement - Dry Deck fountain Civil Repairs PCS 1 11/09/2026 25/09/2026